Workshop siding is finished
Roger and crew have finished putting the siding on my workshop. They have done a very nice job. Now it is my turn to finish drying it in by installing windows and doors. Still a lot of work to do before that can happen. I have to fill the window spring grooves in each of the 40+ window sashes that I plan to use. Also, I have to build doors for the 8'x10' main opening.It's a gusher!
This is the first time the new well pump has been run since the drilling team finished with the well. It looks like Tim has done everything very nicely. The water ran clear almost immediately (most of the dirt probably came from the garden hose). Next steps are to install a 1600 gallon water storage tank and run about 400 feet of 1" PVC.OK. So 2014 is going to be a busy year. Have I mentioned the solar electric project?















