I bought this property in 2005 and named it Richmond Woods for my father who taught me about nature and respect for the wild. It's located in Alabama near the Alabama/Georgia state line. The small nearby village of Mentone, AL has been a mountain retreat for 150 years for people escaping the summer heat of Birmingham and Atlanta. My companion, Carolyn, has helped me every step of the way.

A Cottage in the Woods
When you were little, did someone read fairy tales to you? Invariably, there was mention of a cottage in the woods. Our plan is to build such a place: handmade, no architect plans, buying local materials or using salvaged materials. The purpose of this blog is to document our progress.

Friday, September 25, 2015

Decked!

As I mentioned in my previous post, it is time for some wood-work. But first...


... a barrier against those pesky wood-eating insects. I used 10" wide aluminum flashing. Since aluminum is quickly corroded by chemicals found in both cement and pressure treated wood, I protected it by sandwiching between layers of tar paper. Both tar paper and aluminum are soft enough to be easily punched by placing the sandwich over one of the J-bolts with a 5/8 socket over it. A sharp rap with a hammer and, voila!, a hole. I learned this trick (and many others) from Chuck Henson. Chuck, you live on in my life.

The joists were laid out and end-nailed through the band board. Then, using lumber not fit for joists, I cut and nailed blocks to run down the center line to prevent rolling. One of the joists is doubled all the way across. This is to provide a full nailing surface for the end of the decking. I really hate trying to nail two butting pieces of sheathing or decking to a single 2X edge so I almost always double my joists, studs, or rafters where butting will occur. I also doubled other joists from the wall to the center beam under the area where the battery will be situated.


Before the decking was nailed down, I placed some polyethylene sheeting in the ground below the floor to keep moisture from rising to the wood. The ground was sloped from all walls and corners to the center of the back wall where there is a pile of rock and rubble covering a single un-mortared joint at footer level. Condensate will collect on the plastic sheet and run down to this drain slot and outside near the low point of the elevation.


I used Advantech decking because it has a tongue and groove milled into the long edges. This makes a nice sturdy joint without the need for additional blocking between the joists. HOWEVER, the manufacturer in all its wisdom decided to keep the overall 4X8 format of plywood and other sheet products. This sounds great until you realize that the tongue is milled from part of the 4' dimension. So, you loose 1/2" inch of coverage for every sheet you put down. In this tiny structure, that amounted to only 1 1/2". In my shop, however, this added up to 4" over the 32' length. I had to nail down a strip of 1X to make up for the loss in that case.


With the decking nailed down, I ran to town for a load of 2X4 and OSB. Time for some walls. I like building walls on the floor. This makes everything easier. But, the price is that you eventually have to get the wall vertical. Blocks were nailed to the band board to prevent the wall from sliding off the floor while it was being raised. I used a crowbar and blocks to get it high enough to get the farm jack under it. The jack was able to lift it another 3 1/2 feet. From there I used lengths of 2X4 to form legs to hold the wall in place while another set of legs was positioned. I would lift the wall until the legs swung perpendicular to the floor then rest it. Another set of legs would then be nailed for the next lift. In this way, the wall was "walked" up until I was able to make the last push in one go. The tire is there to keep me from being completely flattened should something go wrong.



One wall up, three to go.


Monday, September 14, 2015

Block Party!

Perhaps if I had served refreshments, it would have been more fun. But, alas, it was simply dull back bending work. But now it is done. I am ready to trade in the burn of green cement for the sharp sting of wood splinters.




Since the battery for this power facility will weigh nearly 2000 pounds, I decided to beef up the floor with a center support beam. To facilitate this, I left a gap in each end wall and built two piers in the middle of the foundation. On this I will rest a 6 X 8 laminated wood beam made of 3 pressure treated 2 X 8's nailed and glued together. The floor joists will rest on top of this. To ensure a stiff breeze won't blow anything away, 1/2" J-bolts are embedded in the block fill every 3 or 4 feet.




With all blocks in place, I spent considerable time filling each cavity with concrete made from some "stale" mortar mix I never got around to using on the water project. To make it go far enough I bought a trailer load of gravel and added some Portland cement to ensure it set properly. Another late nighter.



Monday, September 7, 2015

Rains, Roots, and Rocks

Besides rain and roots the only other thing slowing me down is rocks.


Once I have a nice hole in the ground of the proper depth, the next thing to do is to add some rebar. Reinforcing bar (rebar) helps keep the concrete slab from cracking. To make the 90 degree bends, I use an angle grinder to make a large notch halfway through the bar at the point of the bend. This allows the bar to bend without breaking (usually). Then to make it strong again, I weld the seam.


The rebar is held 2 inches from the bottom of the trench by pieces of brick. Concrete is then carefully shoveled in over the top of the rebar and brick pieces (as opposed to just dumping a wheelbarrow load in the hole) to keep them from being moved around.


When you start pouring a footer, you have to keep at it until it is finished. I got started late on the first one and was working until late at night to get it finished. Trust me, it is much better to work by the broad light of day than by the spots of light afforded by artificial means. Be sure to have some good knee pads because you will be on your hands and knees troweling and floating the concrete until it is level and smooth.


I finally got tired of running up to the “yellow store” to get ice for my ice chest. I bought this 3.2 cubic foot refrigerator and built a little base for it to sit on. The base helps prevent blood from rushing to your head when retrieving something from the bottom shelf and it provides a tiny bit of badly needed storage space. The fridge runs on about 2.35 KWHr per week – an average of 14W/hr – about the same as a 60W equivalent compact fluorescent lamp. Not bad. It has no freezer compartment but that is why it is so efficient.