Today Chuck came over and got me started putting the finishing touches on the roof. First we installed the rake angle. This is the trim piece that covers the gable edge of the roofing to give it a finished look. It also covers and protects the ends of the purlins.
Because this is recycled industrial roofing, there is no readily available form-fitted closure strips. These are the strips that go between the roofing and the ridge cap to prevent rain from blowing in where the valleys leave large gaps. So, Chuck had some U-channel made that tightly fits over the corrugations of the roofing. We put a bunch of caulking in the bottom of the U-channel and then along the edge of the roofing so that when they were cupped together a seal would be formed.
Then a strip of caulking was run down each edge of the ridge cap pieces and they were centered over the U-channel and stuck down. It sounds simple (and generally it is) but there is a lot of snipping and cutting with shears to make everything fit nicely. Multiple lines of silicone caulk at each overlap of the ridge cap ensures wind-blown rain will not find its way in.
When this was finished, the side laps had to be fastened down. This is where the edges of two adjacent roofing sheets overlap. Again, because this was previously installed material, there were already holes in the sheets. Naturally, they did not line up so I had to drill the underlying sheet at each of the existing holes in the upper sheet. Let's see, that is a hole plus a screw every 14 inches of each of 32 sixteen foot runs... that's about 384 holes and screws! Oh my aching back!!
Lastly, with caulk gun in hand, I hunted down each and every hole in the roofing that was not filled with a screw and plugged it with silicone. I reckon I might have to do this one more time before I die. Nah! I'll get the grand kids to do it :)
Well that's it for the roof. Next up are some walls and windows.