Using some salvaged PVC pipe for rollers, the deck has been moved far enough away to make room for laying the foundation. Hopefully, I will complete the concrete work before freezing weather arrives.
Once the deck is in position and fastened to the cabin, we will frame it in. After that, comes the roof framing for the entire structure.
I suppose I would be a lot further along now if I did not take time occasionally to smell the flowers, play with the bugs, ...
and do a little rappelling with my human friends.