May 16 - I hauled 1.16 tons of crushed limestone from the Vulcan quarry in Ft, Payne to form the base for the water storage tank. This material will provide good drainage and once packed by the weight of the full tank (around 12,000 pounds) will form a solid base that will not further compress.
May 17 - Dry laying the cinder block revealed that the carefully calculated radii of the footer were not so carefully implemented. Twenty cinder block would not fit within the circumference - it would have to be nineteen. The pass-thru (so carefully placed) was then found to be in the wrong place and had to be moved. Another good example of the difference between "as designed" and "as built".
May 20 - The first course of block were set on the footer with mortar taking care to evenly space the joints, maintain the radius, and take out any unevenness in the footer surface.
May 21 - Hauled another 1.81 tons of limestone from the quarry and finished filling in the tank base up to the level of the first course of block. The bed was lightly tamped with my boots and struck off level with the top of the block. The tank was tipped onto its side, rolled into position at the edge of the cinder blocks, and finally tipped back over onto its bottom. A little pushing and shoving got it centered in the circle and aligned with the pass-thru in the footer.
May 22 - I dry stacked a few blocks around the drain opening/pass-thru area to see how the access opening would look. The rest of the block had to be moved to make way for the Ditch Witch.
May 24 - 27 Trenching! Even if there had been not one rock or root, this machine would have worn me slap out! As it is, though, there were rocks and roots galore. When the obstruction was not too much for the machine, it would eventually cut through the root or turn up the rock. This action would sometimes result in violent lurching of the trencher which in turn would attempt to jerk my shoulders out of their sockets.
Where the root or rock was simply too large, the trencher would have to be repositioned until it was clear of the immoveable object. This left a number of obstacles for me to overcome manually. Tree roots can be handled with my sacrificial "dirt axe". This is an old axe which has seen better days but which still can be sharpened and used in the dirt where it will quickly be dulled and filled with nicks. Rocks are a different story. Sometimes they can be dug out using a 6-foot pry bar. Sometimes not. I will probably have to rent a jack-hammer for those. In all of these cases, when the obstacle is removed, there still remains trench to be dug by hand down to 24 inches. Folks this is work for young people.
May 28 - Its Laundry Day! Yes, all that dirt digging has created a great mound of dirty clothes. I have not much electricity and zero washing machines but I do have plenty of well water and a couple of wash tubs left over from some long ago beer party, so...
May 29 - Tunnelling! I brought the trencher as close to the footer of the cabin as I dared. I finished the trench for the kitchen sink with post hole diggers up to the footer then switched to the pry bar for tunnelling under the footer. I used a saw horse to support the pry bar while swinging it horizontally - battering ram style. A small level kept my digging true. Occasionally I would use a pipe wrench to give the bar a little twist when it was well stuck in the dirt. This would break out a nice hunk. From the crawl space side, I used a WWII trenching tool to dig down and intersect the horizontal hole.
June 2 - Yard Hydrant #2. Followed by a couple 20' sticks of PVC.
June 3 - Trade Day. Carolyn thought we might head over to Trade Day in Summerville to see if we could scare up a new burner for one of our oil lamps. The ones we got at Walmart last year wont fit :(
We didn't have any luck but we had a good time looking at all the stuff for sale.
June 4 - Water Heater. I spent the day first testing and then installing a small on-demand water heater in out little bath house. The test was prompted by some information in the manual that said the unit required 25 psi (minimum) in order to work. This information was not in any of the literature used to sell the thing. I was worried because I had measured only about 10 psi at that location. I set up a ladder to approximate the height of installation, connected the water and the gas, and let 'er rip. It worked like a charm. By dusk that evening, I had a nice hot shower without having to heat water on a stove or pump up a garden sprayer. Luxury!
June 5 - Woke up to a nice thunderstorm. I had a phone interview so I decided on breakfast in town. I spent some more time shopping for groceries and plumbing supplies. I got back in time for another round of thunder storms. While it was raining, I installed the supply line valves under the kitchen sink. the rest of the evening, I spent on this blog update.