I guess you've all been wondering where we've been the past two months. Well, right here in the woods. As I mentioned in the last post I had started work on a vermicomposting flush toilet. It is now complete. The following pictures will summarize the process but generally speaking this is what had to be done:
- Remove the old toilet
- Finish the tile floor
The former toilet was a built-in bench seat that was set diagonally in the room, The tile did not go under it. Fortunately we had just enough whole pieces and scraps left over to replace the diagonally cut tiles. - Build the enclosure for the worm tank
This was necessary for two reasons; to ensure good slope in the sewer line from the house and to help maintain a more constant temperature for the worms. Just don't do what I did and try to destroy your work while back-filling 😢 - Run the sewer line
- Prepare the worm tank
This entailed making four aeration stacks to ensure plenty of oxygen in the system. These stacks consist of 3" PVC with about 20 one inch holes drilled in each then wrapped in fiberglass window screen. The tank itself is a 1000 liter IBC - a big polyethylene container with a 2 inch drain valve in the bottom. A layer of fist size stones was laid in the bottom of the tank then covered with several inches of gravel on top of which was another layer of fiberglass window screen. Finally the tank was filled with aged wood chips. On top was placed a layer of green kitchen waste (vegetable scraps) to give the worms something to munch on until the system was inaugurated. - Run the drain line
The drain line carries the liquid that has filtered through the bed of wood chips and gravel out to the greenfilter. - Prepare the greenfilter
Also called the "soakaway", this element of the system handles the bulk of the flush water. It is a shallow pit (mine is about 3x5 feet and about 18 inches deep. It is also filled with wood chips. The drain line empties into this pit and is covered by about 4 - 6 inches of wood chips. Natural soil bacteria in the first few inches of earth consume the excess nitrogen and generally clean the effluent. - Run waterline
- Install new flush toilet
- Build roof over worm tank for shade
The new system has been in operation for almost 2 weeks now. The worms seem happy and there are no foul odors coming from the tank. So far so good.
Of course, that is not the only thing going on around here. Besides tending the garden - tying, spraying, pruning, weeding - we've had to deal with three broken vehicles. First my Trailblazer started running very rough and about the same time my little tractor had a clutch failure. And, just because bad things seem to come in threes, my riding mower had a catastrophic blade failure. I was able to fix both the mower and my car but the tractor was taken to a mechanic over in Rainsville.
During the storm that cut across Alabama on Juneteenth, I lost a couple of trees. Sadly they were both red oaks. One I was expecting to loose relatively soon to disease. When it went, it took another healthy one with it. Such is life. Now I have other things to do - make wood chips, split firewood, and saw lumber. Yay!
Since the middle of May, we have sighted six snakes around the house, shop, and garden. As good luck would have it, they have all been the kind you want hanging around - rat snakes and king snakes mostly plus one milk snake. These reptilian friends not only keep rodents in check, they are very territorial and do not tolerate venomous snakes.
Well, that's about it. If you have any questions or comments please email me. We'd love to hear from you.
Russ - rustygrey@gmail.com
Carolyn - csmith7173@gmail.com