I purchased wavy board siding from a new source: Roger Chastain. He's in the cabin-building business in Collinsville, AL. These boards are much thicker than the previous wavy board. I wondered how that would work with the corners.
At the back of the workshop, reaching the gable end would require two 30-foot ladders or scaffolding and at least one beefy helper. So I decided to pay professionals to put it up and finish the gable ends. Extra expenditure but worth it. They came Saturday AM, ready to work. They decided to finish the walls first then erect scaffolding to do the gable ends. Here they are, left, putting on the housewrap.
Then they added the corners (smooth edge to butt the boards to) then began the boards.
They were very careful to pick through the boards and find the right piece for each spot. The widest boards are 16-18".
The unfinished space at the top of the wall is going to be windows. I put them up high for ventilation and to keep as much workspace as possible. I already framed all this. See the two high little windows in the gable end? More ventilation. For wintertime use, I'll have a woodburning stove.
At the end nearest the road, I'll have double doors (4' x 10' each) so I can back my trailer up to it to unload things. And maybe a ramp. Here they are, finishing up on Sunday afternoon: I will need more siding! They have another job during the week but will be back Friday and Saturday for another big dent in the project. Hooray! After all these years, I'll soon have a workshop!




















